The San Felasco Parkway is the first phase of a new two lane divided roadway. Phase one is approximately 7,300 LF in length and connects CR 241 to Progress Boulevard in Progress Park. Future phases will extend the parkway to the east.
The first phase has been completed. The roadway consist of two 12-foot travel lanes, 7-foot bike lanes, and 8-foot wide sidewalks. The corridor also includes lighting, landscaping, stormwater, and utilities such as water, sewer, electric, gas, and telecom.
Here is a video from our friends at CHW.